The Diputación will take 15 million to the plenary session to repair 46 roads
Topics Diputación de Almería
The 2027-2028 Road Network Plan will be voted on Monday, November 30, and foresees rehabilitating surfaces and improving safety on stretches throughout the province.
AlmeríaYa newsroom ·
The provincial roads of Almería will have a repair plan worth 15 million euros for 2027 and 2028. The Diputación will take it to the plenary session on Monday, November 30, with 46 actions spread across all the comarcas. Most are pavement rehabilitations on roads whose surface is so deteriorated that routine maintenance is no longer enough.
The plan does not stop at asphalt. It also includes signage and beacons, repair of walls and parapets, lining of ditches to drain water better and widening of the platform where needed. In addition, it plans to finish sections that began in previous plans and were left half-done for lack of budget, and to improve intersections and access to the villages.
Among the largest items are the road from El Ejido to Balanegra via Balerma (760,000 euros), the one from the A-1100 in Albanchez to the A-1101 in Rambla Aljibe de Lubrín (580,000), the one from the N-344 in Retamar to the Cabo de Gata lighthouse (540,000) and the one from the A-7 in Níjar to Las Negras via Campohermoso and Fernán Pérez (530,000). Also listed are the one from the A-92 to Calar Alto via Aulago de Gérgal (520,000) and the one from Topares to the border with Castilla-La Mancha via las Cobatillas de Vélez-Blanco (500,000).
The president of the Diputación, José Antonio García Alcaina, has stated that the plan «contemplates actions in all the comarcas of the province with the aim of reducing conflict points on the network and strengthening road safety». As the provincial institution details, the list has been drawn up taking into account the state of the roads, road safety, accessibility to the municipalities and the need to complete previous works.
The document is put to a vote at the plenary session on Monday, November 30. The works would be carried out over the 2027-2028 biennium.
Breaking news from News, on your phone
An alert only when something can't wait. Free, no account needed.
On iPhone, alerts only arrive if you first add AlmeríaYa to your Home Screen. How to do it, step by step
This browser can't receive alerts. Try another one, such as Chrome or Safari.
You've blocked alerts from AlmeríaYa in this browser. You can turn them back on in its settings. How to do it, step by step
Only what can't wait. Change or remove it in my alerts
Shall we let you know what matters?
Phone alerts
On iPhone, alerts only arrive if you first add AlmeríaYa to your Home Screen. How to do it, step by step
This browser can't receive alerts. Try another one, such as Chrome or Safari.
You've blocked alerts from AlmeríaYa in this browser. You can turn them back on in its settings. How to do it, step by step
